Building works on Level 3

Commencing Friday 4 September until Wednesday 9 September, there will be extensive聽electrical work undertaken in the Level 3 Barr Smith Library聽24-hour space to install new lighting. Therefore, part of the floor will be cordoned off and inaccessible during this period.聽The High Use Collection聽and seating in the front area of the space are still accessible 24/7 (with swipe card access required聽after hours). Access is also still available for the lift and all northern stairwells.聽

Thank you for your patience during this time.聽

Tagged in building works, building access